Manual Bridgeplate Installation
We can provide maintenance and installation solutions across a wide range of sectors. Discover more from our satisfied customers.
 

We installed a new manual bridgeplate on behalf of one of our long-standing customers.

Partners PROMISE

We will go above and beyond for all of our customers, wherever and whoever they are.

Manual bridgeplate installation - before
Manual bridgeplate installation – before

 

Manual bridgeplate installation - after
Manual bridgeplate installation – after

 

The installation was carried our on behalf of a supermarket chain, based in the West Midlands.

The old manual bridgeplate, located in the supermarket’s loading bay, was removed and a new one installed.

The installation was completed by two of our specialist loading system engineers.

Find out more about our loading systems installation services

Return to case studies

HEAD OFFICE:

Pickerings Europe Ltd
Globe Elevator Works
P.O. Box 19
Stockton on Tees
Cleveland
TS20 2AD

T:+44 (0) 1642 607161
F:+44 (0) 1642 677638
E:contact@pickeringslifts.co.uk

Google maps